Measure Vertical Track Deflection with Ease
- Under Full Dynamic Load -
Digitally measure vertical deflection (pumping) of the track.
Attach Dynamic Void by magnetizing it to the web of the rail.
Measure vertical deflection in millimeters or inches.
Set up takes as fast as 3 seconds. There is no need for ballast removal when using Dynamic Void.
As Easy as it Gets
Feedback From The Field
“It’s so valuable to have a tool like this (Dynamic Void) in the field. It’s simple to use and with the previous tool we used, we would have to move ballast and it was pain. This makes it easy and safe and that’s why the guys love it.”
-Amtrak Track Inspector